Balcan Plastics | Facility Renovation

Dynamic recently completed a remodel of an existing building for Balcan to meet their production needs.  The facility included a four-story plastics extruder that required process chilled water for cooling of the equipment in addition to make-up air for heating and cooling the space. 

The chilled water system consists of three (3) chillers for a total of 585 tons of cooling.  Multiple diaphragm pumps were installed to serve a solvent system and compressed air piping was provided to the extrusion line.  Dynamic worked directly with engineers from Europe to design the HVAC systems based on the one-of-a-kind equipment.

Project Highlights

Project Type
Industrial

Size
100,000 SF

Completion Date
2023

Location
Pleasant Prairie, WI

Project Team
Partners in Design | Architect
PremiStar | Mechanical Contractor