Fincantieri Bay Ship | Machine Shop Building
Dynamic provided the plumbing for a new machine shop on the Fincantieri campus.
The plumbing work included toilet rooms, a break room, hose bibs for maintenance purposes, and multiple catch basins for spill containment. Storm drainage was provided for the facility with vertical downspouts on the exterior of the building coordinated with the site civil storm drains.
Project Highlights
Project Type
Industrial
Size
19,000 SF
Completion Date
Fall 2022
Location
Sturgeon Bay, WI
Project Team
Abacus Architects | Architect
A.C.E. Building Service | Construction Manager