Madison Metropolitan School District | Kennedy Elementary School HVAC System Renovation

Dynamic provided the HVAC design for a 450-seat performing arts center auditorium addition to an existing high school. 

The addition is served by two (2) variable air volume, roof mounted air handling units with hot water and remote air cooled condensing units.  The 30’ tall lobby and supporting spaces are served by a single unit and the auditorium is served by the second unit with both utilizing VAV boxes with hot water coils for individual space control.  During design it was determined the existing hot water heating system could support the addition, saving the district the need to add separate boilers for the new addition.

Project Highlights

Project Type
Education

Size
120,000 SF

Completion Date
Fall 2021

Location
Madison, WI

Project Team
Zimmerman Architectural Studios | Architect
Daniels General Contractors | General Contractor
Prime Mechanical | Mechanical Contractor