Howards Grove High School | Performing Arts Center

Dynamic provided the HVAC design for a 450-seat performing arts center auditorium addition to an existing high school. 

The addition is served by two (2) variable air volume, roof mounted air handling units with hot water and remote air cooled condensing units.  The 30’ tall lobby and supporting spaces are served by a single unit and the auditorium is served by the second unit with both utilizing VAV boxes with hot water coils for individual space control.  During design it was determined the existing hot water heating system could support the addition, saving the district the need to add separate boilers for the new addition.

Project Highlights

Project Type
Office

Size
140,000 SF

Completion Date
Spring 2021

Location
Brookfield, WI

Project Team
Eppstein Uhen | Architect
CG Schmidt | Construction Manager
Ahern | Mechanical Contractor