Milwaukee Public Schools | Rogers Street Academy Chiller Replacement

Dynamic provided the replacement of an existing 200-ton air cooled chiller with a new unit.  The replacement of the existing chiller required the replacement of the existing roof rails that were previously constructed of multiple 2x10s and were partially rotting and in need of replacement.  The system chilled water pump was also replaced and equipped with a variable frequency drive and a water filter was added to the system to improve water quality. 

During the field investigation phase of the project, Dynamic observed the chilled water piping in the mechanical room was incorrect as the piping to the air handling unit was backwards and had been piped as such for over ten (10) years.  The piping was modified in construction and is covering the load for the hot summer days the students are in school.

Project Highlights

Project Type
Education

Size
Serves 120,000 SF

Completion Date
Spring 2022

Location
Milwaukee, WI

Project Team
Just Mechanical | Mechanical Contractor