JOHNSON CONTROLS | USER EXPERIENCE SUITE

Johnson Controls | User Experience Suite Dynamic provided the HVAC design for Johnson Controls to repurpose a portion of their downtown office to support the User Experience group, who are dedicated to understanding and improving the overall usability of the Johnson Controls products.  The new suite created a combination of private offices, open offices, and…

JOHNSON CONTROLS | ENGINEERING LABS

Johnson Controls | Engineering Labs Dynamic provided the HVAC, plumbing, and fire protection design for the complete remodel of an existing office space into an engineering lab for five (5) departments including a UL test lab, materials test lab, actuator test lab, valve test lab, and a refrigeration lab.  The space was created with the…

JOHNSON CONTROLS | B1F3 REMODEL

Johnson Controls | B1F3 Remodel Dynamic provided the HVAC design for the remodel of an existing office space at the downtown campus.  The space was served by an existing, outdated air handling unit that was replaced in kind and reconnected to the campus chilled water, hot water, and steam systems for cooling, heating, and humidification…

IRIS USA | CLEANROOM ADDITION

Iris USA | Cleanroom Addition Dynamic worked as part of a design-build team to deliver 32,300 square feet of new manufacturing space for Iris USA, whose parent company is based in Japan.  The new manufacturing space will be dedicated to face mask production in response to the Centers for Disease Control and Prevention’s recommendation to…

MARATHON COUNTY | LVPP BOILER CONVERSION

Marathon County | Lake View Professional Plaza Boiler Conversion Dynamic was selected by Marathon County to convert their existing Lake View Professional Plaza from steam to hot water.  The LVPP building was previously served from an adjacent facility with steam distribution piping to a shell and tube heat exchanger located in the building.  Over time,…

ACUITY INSURANCE | NORTHWEST BUILDING ADDITION

Acuity Insurance | Northwest Addition Buildout Dynamic was retained by Acuity to provide design and construction oversight on the latest buildout of the shell space due to our knowledge of the building standards and design parameters.  The buildout completes the last portion of the building to be added to the duct distribution system that is…