JOHNSON FINANCIAL GROUP | OFFICE RENOVATION

Johnson Financial Group | Cathedral Place Buildout Dynamic provided the HVAC design for Johnson Financial Group’s relocation to downtown Milwaukee.  The new office space consists of the top two (2) floors in Cathedral Place off of Cathedral Square in downtown offing breathtaking views of the City.  The HVAC design reused the existing self-contained serving each…

WELLPOINT | CLINICAL SERVICES

SaintA | Clinical Services Buildout Dynamic provided the HVAC design for remodel of an existing, unused space within the SaintA campus to create a new office space.  The remodeled space is served by a variable refrigerant flow (VRF) heat recovery system with a dedicated outside air system to provide ventilation air to each of the…

REINHART LAW | OFFICE RENOVATION

Reinhart Law | Office Renovation Dynamic provided design-assist services for a complete remodel of the top five (5) floors of a twenty-three-story office building.  The office space leased by Reinhart had not been updated since the 1991 and the Owner was experiencing frequent temperature control issues.  Each floor is served by a dedicated air handling…

JOHNSON CONTROLS | USER EXPERIENCE SUITE

Johnson Controls | User Experience Suite Dynamic provided the HVAC design for Johnson Controls to repurpose a portion of their downtown office to support the User Experience group, who are dedicated to understanding and improving the overall usability of the Johnson Controls products.  The new suite created a combination of private offices, open offices, and…

JOHNSON CONTROLS | ENGINEERING LABS

Johnson Controls | Engineering Labs Dynamic provided the HVAC, plumbing, and fire protection design for the complete remodel of an existing office space into an engineering lab for five (5) departments including a UL test lab, materials test lab, actuator test lab, valve test lab, and a refrigeration lab.  The space was created with the…

JOHNSON CONTROLS | B1F3 REMODEL

Johnson Controls | B1F3 Remodel Dynamic provided the HVAC design for the remodel of an existing office space at the downtown campus.  The space was served by an existing, outdated air handling unit that was replaced in kind and reconnected to the campus chilled water, hot water, and steam systems for cooling, heating, and humidification…

ACUITY INSURANCE | NORTHWEST BUILDING ADDITION

Acuity Insurance | Northwest Addition Buildout Dynamic was retained by Acuity to provide design and construction oversight on the latest buildout of the shell space due to our knowledge of the building standards and design parameters.  The buildout completes the last portion of the building to be added to the duct distribution system that is…