Skip to content
info@dynamicmke.com
414-731-9559
Dynamic Consulting Engineers LLC
Dynamic Consulting Engineers LLC
Dynamic Consulting Engineers LLCDynamic Consulting Engineers LLC
  • HOME
  • ABOUT
  • TEAM
  • SERVICES
  • PROJECTS
  • PUBLICATIONS
  • CONTACT US
Search:
  • HOME
  • ABOUT
  • TEAM
  • SERVICES
  • PROJECTS
  • PUBLICATIONS
  • CONTACT US
ZoomDetails

MILWAUKEE PUBLIC SCHOOLS | ROGERS STREET CHILLER REPLACEMENT

EducationBy adminJuly 2, 2022

Milwaukee Public Schools | Rogers Street Academy Chiller Replacement Dynamic provided the replacement of an existing 200-ton air cooled chiller with a new unit.  The replacement of the existing chiller required the replacement of the existing roof rails that were previously constructed of multiple 2x10s and were partially rotting and in need of replacement.  The…

ZoomDetails

MADISON METROPOLITAN SCHOOL DISTRICT | SHERMAN/SHABAZZ SCHOOL DECARBONIZATION

Education, On The BoardsBy adminJuly 1, 2022

Howards Grove High School | Performing Arts Center Dynamic provided the HVAC design for a 450-seat performing arts center auditorium addition to an existing high school.  The addition is served by two (2) variable air volume, roof mounted air handling units with hot water and remote air cooled condensing units.  The 30’ tall lobby and…

ZoomDetails

MILWAUKEE SCHOOL OF ENGINEERING | CAMPUS CENTER CHILLER & COOLING TOWER REPLACEMENT

EducationBy adminJuly 1, 2022

Milwaukee School of Engineering | Campus Center Chiller & Cooling Tower Replacement The Milwaukee School of Engineering was operating on an outdated chiller that was in need of replacement.  Dynamic provided a new 600 ton chiller to replace the existing 800 ton chiller as the building has gone through adjustments over time allowing for a…

ZoomDetails

MADISON METROPOLITAN SCHOOL DISTRICT | KENNEDY ELEMENTARY SCHOOL HVAC RENOVATION

EducationBy adminJuly 1, 2022

Madison Metropolitan School District | Kennedy Elementary School HVAC System Renovation Dynamic provided the HVAC design for a 450-seat performing arts center auditorium addition to an existing high school.  The addition is served by two (2) variable air volume, roof mounted air handling units with hot water and remote air cooled condensing units.  The 30’…

ZoomDetails

UW-MILWAUKEE BOLTON HALL | PERIMETER HEATING UPGRADES

EducationBy adminJuly 1, 2022

UW-Milwaukee | Bolton Hall Perimeter Heating Upgrades Dynamic was retained by the State of Wisconsin to provide perimeter heating upgrades to Bolton Hall that has been plaguing the university since the previous installation was completed over eight (8) years ago.  In this building it was not uncommon for users to wear coats in the winter,…

ZoomDetails

UW-FOX VALLEY | SCIENCE BUILDING BOILER REPLACEMENT

EducationBy adminJuly 1, 2022

UW – Fox Valley | Science Building Boiler Replacement Dynamic was retained to replace two (2) 2500 MBH steam boilers serving the Science Building at UW-Fox Valley and replace all the steam fired equipment.  Dynamic provided a thorough analysis of various boiler options from multiple manufacturers and the Owner determined to provide a low temperature…

ZoomDetails

HOWARDS GROVE HIGH SCHOOL | PERFORMING ARTS CENTER

EducationBy adminJune 27, 2022

Howards Grove High School | Performing Arts Center Dynamic provided the HVAC design for a 450-seat performing arts center auditorium addition to an existing high school.  The addition is served by two (2) variable air volume, roof mounted air handling units with hot water and remote air cooled condensing units.  The 30’ tall lobby and…

DYNAMIC CONSULTING ENGINEERS LLC 2022
Go to Top